- Latest
|
|
|
|
|
Paul Flowers, Vice President van het GROHE design team |
|
Date: 05 Tháng 5 2012 Category: Technology |
|
|
|
|
|
|
|
|
|
|
|
Video clip about Chu Lai economic zone with multidimensional viewpoint, which was used in UN-HABITAT Vietnam\'s Leadership Training Workshops. (UN-HABITAT thực hiện) |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
Video clip about Vision of Hoi An, was used in UN-HABITAT Vietnam\'s Leadership Training Workshops. (UN-HABITAT thực hiện) |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
Interview Habitat Programme Manager Dr Nguyen Quang about Cities and Climate Change. |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
Info TV interviewed Ms Do Minh Huyen UN-HABITAT urban specialist about Urbanization in Vietnam. |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
Info TV interviewed Ms. Do Minh Huyen - UN-HABITAT Urban Specialist about Vietnamese Urban Indicators |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
- Most Viewed
|
|
|
|
|
Thăm Bảo tàng Corpus - vừa khánh thành tại thành phố Oegstgeest, Hà Lan - du khách không chỉ có dịp “đi vào” cơ thể con người, mà còn khám phá cơ chế hoạt động của nó. Bài viết: http://mag.ashui.com/index.php/chuyenmuc/kientruc/67-kientruc/217-bao-tang-corpus-dao-choi-trong-co-the-nguoi.html [More] [Less] |
|
Date: 04 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Video clip about Vision of Hoi An, was used in UN-HABITAT Vietnam\'s Leadership Training Workshops. (UN-HABITAT thực hiện) |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
The Beijing National Stadium (traditional Chinese: 北京國家體育場; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guójiā Tǐyùchǎng; Tongyong Pinyin: Běijīng Guójiā Tǐyùchǎng), also known as the National Stadium,[1] or the \"Bird\'s Nest\" (鳥巢) for its architecture, is a stadium finished for the Olympic Green in Beijing, China that has so far been completed as of March 2008.[2] The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located east of the Beijing National Aquatics Centre. In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas Eve December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that 2 workers had died during the stadium\'s construction. The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel[citation needed], with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billion yuan (≈423 million USD). Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power [More] [Less] |
|
Date: 30 Tháng 8 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Frank Lloyd Wright - Johnson Wax Administrative Building |
|
Date: 10 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Info TV interviewed Ms. Do Minh Huyen - UN-HABITAT Urban Specialist about Vietnamese Urban Indicators |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
|
|
|
|
|
Interview Habitat Programme Manager Dr Nguyen Quang about Cities and Climate Change. |
|
Date: 29 Tháng 2 2012 Category: Show / TV |
|
|
|
|
|
|
- Highest Rated
|
|
|
|
|
The Beijing National Stadium (traditional Chinese: 北京國家體育場; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guójiā Tǐyùchǎng; Tongyong Pinyin: Běijīng Guójiā Tǐyùchǎng), also known as the National Stadium,[1] or the \"Bird\'s Nest\" (鳥巢) for its architecture, is a stadium finished for the Olympic Green in Beijing, China that has so far been completed as of March 2008.[2] The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located east of the Beijing National Aquatics Centre. In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas Eve December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that 2 workers had died during the stadium\'s construction. The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel[citation needed], with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billion yuan (≈423 million USD). Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power [More] [Less] |
|
Date: 30 Tháng 8 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
L\'architetto Renzo Piano intervistato da Beppe Severgnini (28/12/2007). Primi 10 minuti. (L\'intervista completa dura 43 minuti). |
|
Date: 30 Tháng 8 2008 Category: Architects |
|
|
|
|
|
|
|
|
|
|
|
Thăm Bảo tàng Corpus - vừa khánh thành tại thành phố Oegstgeest, Hà Lan - du khách không chỉ có dịp “đi vào” cơ thể con người, mà còn khám phá cơ chế hoạt động của nó. Bài viết: http://mag.ashui.com/index.php/chuyenmuc/kientruc/67-kientruc/217-bao-tang-corpus-dao-choi-trong-co-the-nguoi.html [More] [Less] |
|
Date: 04 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Frank Lloyd Wright - Johnson Wax Administrative Building |
|
Date: 10 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Architecture! Frank Lloyd Wright - Johnson Wax Administrative Building |
|
Date: 10 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
|
|
|
|
|
Architecture! Frank Lloyd Wright - Johnson Wax Administrative Building |
|
Date: 10 Tháng 9 2008 Category: Buildings |
|
|
|
|
|
|
- Featured
- Categories
|
|